Project Details
Description
The purpose of this project is to develop cost-effective, non-proprietary UHPC mixtures that meet target mechanical performance for ready mix and precast applications and to develop a bridge beam application that can be readily adopted by the precast concrete industry. This is primarily achieved via: (1) development of non-proprietary UHPC mixtures using inexpensive and locally available ingredients, (2) fiber optimization to reduce reliance on expensive steel microfibers, (3) numerical/analytical study of the Pennsylvania Bulb-Tee bridge beam, (4) design of a lightweight bridge beam and a long span bridge beam based on an optimized bulb-tee geometry, and (5) fabrication and evaluation of UHPC bulb-tee bridge members.
Status | Finished |
---|---|
Effective start/end date | 6/5/18 → 9/30/24 |
Funding
- U.S. Department of Transportation: $385,421.00
- U.S. Department of Transportation: $198,506.00
- U.S. Department of Transportation: $383,210.00
- U.S. Department of Transportation: $295,310.00
- U.S. Department of Transportation: $378,499.00
- U.S. Department of Transportation: $342,826.00
- U.S. Department of Transportation: $279,457.00
- U.S. Department of Transportation: $197,882.00
- U.S. Department of Transportation: $318,450.00
- U.S. Department of Transportation: $251,090.00
- U.S. Department of Transportation: $383,210.00
- U.S. Department of Transportation: $139,808.00
- U.S. Department of Transportation: $48,546.00
- U.S. Department of Transportation: $318,450.00
- U.S. Department of Transportation: $251,090.00
- U.S. Department of Transportation: $342,826.00
- U.S. Department of Transportation: $259,921.00
- U.S. Department of Transportation: $224,832.00
- U.S. Department of Transportation: $350,000.00
- U.S. Department of Transportation: $385,421.00
- U.S. Department of Transportation: $245,676.00
- U.S. Department of Transportation: $300,000.00
- U.S. Department of Transportation: $368,828.00