Reducing the Cost and Facilitating Broader Adoption of Ultra-High-Performance Concrete (UHPC) in Bridges

  • Rajabipour, Farshad (PI)
  • Naito, Clay C. (CoPI)
  • Wang, Linbing L. (PI)
  • Sause, R. (PI)
  • Lattanzi, David D. (PI)
  • Miller-hooks, Elise E. (PI)
  • Mcneil, Sue S. (PI)
  • Mondal, Paramita P. (PI)
  • Head, Monique M. (PI)
  • Stoffels, Shelley Marie (CoPI)
  • Papakonstantinou, Konstantinos (CoPI)
  • Palese, Joseph J. (PI)
  • Roberts-wollmann, Carin C. (PI)
  • Donnell, Eric Todd (PI)
  • Gifford, Jonathan L. (PI)
  • Shenton, Harry H. (PI)
  • Efe, Steve S. (PI)
  • Tatar, Jovan J. (PI)
  • Sarlo, Rodrigo (PI)
  • Abbas, Montasir M. (CoPI)
  • Dai, Fei F. (CoPI)
  • Pakzad, Shamim S. (PI)
  • Huang, Hai H. (PI)
  • Zarembski, Allan A. (CoPI)
  • Dai, Fei F. (PI)
  • Takac, Martin M. (CoPI)
  • Shokouhian, Mehdi M. (PI)
  • Guler, S S. (PI)
  • Gayah, Vikash Varun (CoPI)
  • Radlinska, Aleksandra Z. (PI)
  • Kusko, Chad C. (PI)
  • Attoh-okine, Nii N. (CoPI)
  • Yoon, Yoojung Y. (PI)
  • Na, Ri R. (PI)
  • Lattanzi, David D. (CoPI)
  • Hebdon, Matthew H M.H. (CoPI)
  • Zaniewski, J J. (CoPI)
  • Brand, Alexander A. (PI)
  • Kaladharan, Gopakumar G. (CoPI)
  • Casady, Carter C. (CoPI)
  • Solaimanian, Mansour (PI)
  • Qiu, Tong T. (CoPI)
  • Shen, Chaopeng C. (CoPI)
  • Head, Monique M. (CoPI)
  • Frangopol, Dan D. (PI)
  • Guler, Ilgin I. (PI)
  • Qui, Tong T. (PI)
  • Pessiki, S S. (PI)
  • Hodgson, Ian I. (CoPI)

Project: Research project

Project Details

Description

The purpose of this project is to develop cost-effective, non-proprietary UHPC mixtures that meet target mechanical performance for ready mix and precast applications and to develop a bridge beam application that can be readily adopted by the precast concrete industry. This is primarily achieved via: (1) development of non-proprietary UHPC mixtures using inexpensive and locally available ingredients, (2) fiber optimization to reduce reliance on expensive steel microfibers, (3) numerical/analytical study of the Pennsylvania Bulb-Tee bridge beam, (4) design of a lightweight bridge beam and a long span bridge beam based on an optimized bulb-tee geometry, and (5) fabrication and evaluation of UHPC bulb-tee bridge members.
StatusFinished
Effective start/end date6/5/189/30/24

Funding

  • U.S. Department of Transportation: $385,421.00
  • U.S. Department of Transportation: $198,506.00
  • U.S. Department of Transportation: $383,210.00
  • U.S. Department of Transportation: $295,310.00
  • U.S. Department of Transportation: $378,499.00
  • U.S. Department of Transportation: $342,826.00
  • U.S. Department of Transportation: $279,457.00
  • U.S. Department of Transportation: $197,882.00
  • U.S. Department of Transportation: $318,450.00
  • U.S. Department of Transportation: $251,090.00
  • U.S. Department of Transportation: $383,210.00
  • U.S. Department of Transportation: $139,808.00
  • U.S. Department of Transportation: $48,546.00
  • U.S. Department of Transportation: $318,450.00
  • U.S. Department of Transportation: $251,090.00
  • U.S. Department of Transportation: $342,826.00
  • U.S. Department of Transportation: $259,921.00
  • U.S. Department of Transportation: $224,832.00
  • U.S. Department of Transportation: $350,000.00
  • U.S. Department of Transportation: $385,421.00
  • U.S. Department of Transportation: $245,676.00
  • U.S. Department of Transportation: $300,000.00
  • U.S. Department of Transportation: $368,828.00