Abstract
This paper presents a formulation for the plant layout problem, incorporating more than two input factors that may be either qualitative or quantitative in nature. A heuristic is presented which combines a construction and improvement procedure to quickly develop a good layout from the formulation. The output layout from the heuristic may be used directly as the final layout or it may be used as a good starting layout for any other computerized layout improvement procedure. The heuristic is illustrated with a practical example of a large plant with 36 departments.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 1773-1789 |
| Number of pages | 17 |
| Journal | International Journal of Production Research |
| Volume | 30 |
| Issue number | 8 |
| DOIs | |
| State | Published - Aug 1992 |
All Science Journal Classification (ASJC) codes
- Industrial and Manufacturing Engineering
- Strategy and Management
- Management Science and Operations Research