Abstract
In this paper we investigate on a special type of job scheduler for distributed heterogeneous systems called the switch and feedback job scheduler. The main objective of the centralized job scheduler is to achieve maximum performance with reduced waiting time and faster response time for independent tasks by reordering the processor queue list based on the feedback received from each individual local processing system.
Original language | English (US) |
---|---|
State | Published - Mar 22 2009 |
Event | 2009 Spring Simulation Multiconference, SpringSim 2009 - San Diego, United States Duration: Mar 22 2009 → Mar 27 2009 |
Other
Other | 2009 Spring Simulation Multiconference, SpringSim 2009 |
---|---|
Country/Territory | United States |
City | San Diego |
Period | 3/22/09 → 3/27/09 |
All Science Journal Classification (ASJC) codes
- Modeling and Simulation