Abstract
The problem of minimizing the mean squared deviation (MSD) of job completion times about a given common due date in n-job, single-machine scheduling is considered. We propose an integer programming formulation and a Lagrangian solution procedure to approximately solve the tightly restricted version of the MSD problem.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 205-211 |
| Number of pages | 7 |
| Journal | Operations Research Letters |
| Volume | 15 |
| Issue number | 4 |
| DOIs | |
| State | Published - May 1994 |
All Science Journal Classification (ASJC) codes
- Software
- Management Science and Operations Research
- Industrial and Manufacturing Engineering
- Applied Mathematics
Fingerprint
Dive into the research topics of 'A quadratic integer programming method for minimizing the mean squared deviation of completion times'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver