Abstract
In multiple sourcing, replenishment orders for one stock item may be placed at the sametime with several suppliers. In order to determine the re-order level and the size of the bufferstock, we then need to estimate the mean and variance of the effective lead time, i.e. the smallest of the lead times. Previous work on this topic has assumed that the mean and variance are either known or may be estimated from large samples, but the number of observations typically available is small. This paper presents a Bayesian approach to the problem when the lead times are independent and normally distributed, although itis shown that the method may be used in more general circumstances. The computational proceduresare described and illustrated with an example.
Original language | English (US) |
---|---|
Pages (from-to) | 247-252 |
Number of pages | 6 |
Journal | Journal of the Operational Research Society |
Volume | 44 |
Issue number | 3 |
DOIs | |
State | Published - Jan 1 1993 |
All Science Journal Classification (ASJC) codes
- Management Information Systems
- Strategy and Management
- Management Science and Operations Research
- Marketing