ANALYSIS OF CAPACITY PLANNING AND MATERIAL HANDLING SYSTEMS: A CASE STUDY.

Larry Williams, Arunachalam Ravindran, B. L. Foote, A. Badiru, L. Leemis

Research output: Contribution to conferencePaperpeer-review

Abstract

A Modular Repair Center (MRC) concept was adopted in layouting the engine repair facility in an Air Force Depot. A large general simulation model was developed using SLAM to simulate all activities in an MRC, e. g. , sizing, location, storage and handling. A network optimization model was then used for the design of the mechanized material handling system connecting the MRC's.

Original languageEnglish (US)
Pages153-162
Number of pages10
StatePublished - Dec 1 1986

All Science Journal Classification (ASJC) codes

  • General Engineering

Fingerprint

Dive into the research topics of 'ANALYSIS OF CAPACITY PLANNING AND MATERIAL HANDLING SYSTEMS: A CASE STUDY.'. Together they form a unique fingerprint.