TY - JOUR
T1 - Analytics for power grid distribution reliability in New York City
AU - Rudin, Cynthia
AU - Ertekin, Şeyda
AU - Passonneau, Rebecca
AU - Radeva, Axinia
AU - Tomar, Ashish
AU - Xie, Boyi
AU - Lewis, Stanley
AU - Riddle, Mark
AU - Pangsrivinij, Debbie
AU - McCormick, Tyler
PY - 2014
Y1 - 2014
N2 - We summarize the first major effort to use analytics for preemptive maintenance and repair of an electrical distribution network. This is a large-scale multiyear effort between scientists and students at Columbia University and the Massachusetts Institute of Technology and engineers from the Consolidated Edison Company of New York (Con Edison), which operates the world's oldest and largest underground electrical system. Con Edison's preemptive maintenance programs are less than a decade old and are made more effective with the use of analytics developing alongside them. Some of the data we used for our projects are historical records dating as far back as the 1880s, and some of the data are free-text documents typed by Con Edison dispatchers. The operational goals of this work are to assist with Con Edison's preemptive inspection and repair program and its vented-cover replacement program. This has a continuing impact on the public safety, operating costs, and reliability of electrical service in New York City.
AB - We summarize the first major effort to use analytics for preemptive maintenance and repair of an electrical distribution network. This is a large-scale multiyear effort between scientists and students at Columbia University and the Massachusetts Institute of Technology and engineers from the Consolidated Edison Company of New York (Con Edison), which operates the world's oldest and largest underground electrical system. Con Edison's preemptive maintenance programs are less than a decade old and are made more effective with the use of analytics developing alongside them. Some of the data we used for our projects are historical records dating as far back as the 1880s, and some of the data are free-text documents typed by Con Edison dispatchers. The operational goals of this work are to assist with Con Edison's preemptive inspection and repair program and its vented-cover replacement program. This has a continuing impact on the public safety, operating costs, and reliability of electrical service in New York City.
UR - http://www.scopus.com/inward/record.url?scp=84906322929&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84906322929&partnerID=8YFLogxK
U2 - 10.1287/inte.2014.0748
DO - 10.1287/inte.2014.0748
M3 - Article
AN - SCOPUS:84906322929
SN - 0092-2102
VL - 44
SP - 364
EP - 382
JO - Interfaces
JF - Interfaces
IS - 4
ER -