Abstract
Master production schedules are usually updated by the use of a rolling schedule. Previous studies on rolling schedules seem to form the consensus that frequent replanning of a master production schedule (MPS) can increase costs and schedule instability. Building on previous research on rolling schedules, this study addresses the impact of overestimation or underestimation of demand on the rolling horizon MPS cost performance for various replanning frequencies. The MPS model developed in this paper is based on actual data collected from a paint company. Results indicate that under both the forecast errors conditions investigated in this study, a two- replanning interval provided the best MPS cost performance for this company environment. However, results from the sensitivity analysis performed on the MPS model indicate that when the setup and inventory carrying costs are high, a 1- month replanning frequency (frequent replanning) seems more appropriate for both of the above forecast error scenarios.
Original language | English (US) |
---|---|
Pages (from-to) | 682-689 |
Number of pages | 8 |
Journal | Production Planning and Control |
Volume | 10 |
Issue number | 7 |
DOIs | |
State | Published - Jan 1999 |
All Science Journal Classification (ASJC) codes
- Computer Science Applications
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering