Abstract
This study considers a new flow shop scheduling problem with a synchronous material movement. Specifically, we consider an automated machining center that consists of a loading/unloading station, two CNC machine stations, and a material handling device. The material handling device is a rotary table that moves parts between stations simultaneously. Given a set of jobs that need to be processed in the machining center, the objective of the problem is to find the sequence that minimizes the makespan. A dynamic programming algorithm is proposed to obtain an optimal sequence. The computational effort of the algorithm is also analyzed.
Original language | English (US) |
---|---|
Pages | 378-383 |
Number of pages | 6 |
State | Published - Dec 1 2008 |
Event | IIE Annual Conference and Expo 2008 - Vancouver, BC, Canada Duration: May 17 2008 → May 21 2008 |
Other
Other | IIE Annual Conference and Expo 2008 |
---|---|
Country/Territory | Canada |
City | Vancouver, BC |
Period | 5/17/08 → 5/21/08 |
All Science Journal Classification (ASJC) codes
- Computer Science Applications
- Software
- Industrial and Manufacturing Engineering