Abstract
U-lines have been used to implement JIT manufacturing. Manufacturers find that U-lines perform better than straight line in volume flexibility, operator flexibility, material handling and product quality. In this work, we attempt to improve dynamic programming (DP) for obtaining a balance in a U-line. In this DP implementation, we consider practical characteristics of the line. This consideration eliminates producing a balance with awkward walking pattern in the line. Computational results using well-known literature problems are also presented.
Original language | English (US) |
---|---|
Pages (from-to) | 463-482 |
Number of pages | 20 |
Journal | International Journal of Industrial and Systems Engineering |
Volume | 6 |
Issue number | 4 |
DOIs | |
State | Published - Oct 2010 |
All Science Journal Classification (ASJC) codes
- Control and Systems Engineering
- Industrial and Manufacturing Engineering