TY - JOUR
T1 - Investigating implementation level of phase-based strategies in transportation infrastructure projects
AU - Safapour, Elnaz
AU - Kermanshachi, Sharareh
AU - Jafari, Amirhosein
N1 - Publisher Copyright:
© 2021 The Author(s).
PY - 2022
Y1 - 2022
N2 - This research performed phase-based studies to determine effective project management tasks, strategies, and outsourcing activities for transportation infrastructure projects. A comprehensive literature review was conducted to discover phase-based project management strategies, tasks, and activities that can be adopted or outsourced by state transportation agencies (STAs), then a survey was designed and distributed nationally through an online platform to STAs. The results of the 96 survey responses were analyzed and demonstrated that team qualifications and environmental planning are the project management strategies that STAs adopt most often. The outcomes of this study will help decision-makers and project managers assess the effects of adopting effective strategies and outsourcing some activities on delivering transportation infrastructure projects on time, within budget, and with the desired level of quality.
AB - This research performed phase-based studies to determine effective project management tasks, strategies, and outsourcing activities for transportation infrastructure projects. A comprehensive literature review was conducted to discover phase-based project management strategies, tasks, and activities that can be adopted or outsourced by state transportation agencies (STAs), then a survey was designed and distributed nationally through an online platform to STAs. The results of the 96 survey responses were analyzed and demonstrated that team qualifications and environmental planning are the project management strategies that STAs adopt most often. The outcomes of this study will help decision-makers and project managers assess the effects of adopting effective strategies and outsourcing some activities on delivering transportation infrastructure projects on time, within budget, and with the desired level of quality.
UR - http://www.scopus.com/inward/record.url?scp=85129524838&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85129524838&partnerID=8YFLogxK
U2 - 10.1139/cjce-2021-0026
DO - 10.1139/cjce-2021-0026
M3 - Article
AN - SCOPUS:85129524838
SN - 0315-1468
VL - 49
SP - 792
EP - 801
JO - Canadian Journal of Civil Engineering
JF - Canadian Journal of Civil Engineering
IS - 5
ER -