Abstract
This study investigates parameters affecting the likelihood of passing school facility construction bonds by local district election. Using statewide data from Michigan, this study analyzes school bond data for urban (n = 30), suburban (n = 164), small town (n = 70), and rural (n = 241) school districts that held capital improvement bond elections from 2000 to 2005. This analysis found four parameters that were significant in predicting either passage or failure of school bonds: bond amount, number of students enrolled, the number of times the bond was attempted, and district urbanicity. Examining district bond passage rates by urbanicity showed that rural districts have worse chances of passing bond elections than urban and suburban districts and that small-town districts have the worst chances of all.
Original language | English (US) |
---|---|
Pages (from-to) | 398-420 |
Number of pages | 23 |
Journal | Educational Policy |
Volume | 24 |
Issue number | 2 |
DOIs | |
State | Published - Mar 2010 |
All Science Journal Classification (ASJC) codes
- Education