T1 - Modeling constraints in design refresh planning
AU - Nelson, Raymond
AU - Sandborn, Peter
AU - Terpenny, Janis P.
AU - Zheng, Liyu
PY - 2011
Y1 - 2011
N2 - When an original equipment manufacturer no longer supplies and/or supports a product then the product is considered to be obsolete. Obsolescence is a significant problem for systems whose operational and support life is much longer than the procurement lifetimes of their constituent components. Unlike high-volume, commercial products, which are quickly evolved, long field life, low-volume systems, such as aircraft may require updates of their components and technology called design refreshes to simply remain manufacturable and supportable. However these systems can't perform design refreshes all the time due to the high nonrecurring and re-qualification costs. One approach to optimally managing this problem is to use DRP (Design Refresh Planning), which is a strategic method for scheduling design refreshes such that the life cycle cost impact of obsolescence is minimized. The planning of these design refreshes is restricted by various constraints, which need to be implemented into the DRP process. These constraints can reflect technology roadmap requirements, obsolescence management realities, logistical restrictions, budget ceilings and management policy. In this paper, constraints imposed on the DRP process are explored, classified within a taxonomy, and implemented in the planning process. A communications system design example is included.
AB - When an original equipment manufacturer no longer supplies and/or supports a product then the product is considered to be obsolete. Obsolescence is a significant problem for systems whose operational and support life is much longer than the procurement lifetimes of their constituent components. Unlike high-volume, commercial products, which are quickly evolved, long field life, low-volume systems, such as aircraft may require updates of their components and technology called design refreshes to simply remain manufacturable and supportable. However these systems can't perform design refreshes all the time due to the high nonrecurring and re-qualification costs. One approach to optimally managing this problem is to use DRP (Design Refresh Planning), which is a strategic method for scheduling design refreshes such that the life cycle cost impact of obsolescence is minimized. The planning of these design refreshes is restricted by various constraints, which need to be implemented into the DRP process. These constraints can reflect technology roadmap requirements, obsolescence management realities, logistical restrictions, budget ceilings and management policy. In this paper, constraints imposed on the DRP process are explored, classified within a taxonomy, and implemented in the planning process. A communications system design example is included.
UR - http://www.scopus.com/inward/record.url?scp=84863584154&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84863584154&partnerID=8YFLogxK
U2 - 10.1115/DETC2011-47644
DO - 10.1115/DETC2011-47644
M3 - Conference contribution
AN - SCOPUS:84863584154
SN - 9780791854860
T3 - Proceedings of the ASME Design Engineering Technical Conference
SP - 939
EP - 949
BT - ASME 2011 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, IDETC/CIE 2011
T2 - ASME 2011 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, IDETC/CIE 2011
Y2 - 28 August 2011 through 31 August 2011
ER -