Abstract
Case study examines the issues and life cycle cost analyses involved in selecting a natural gas-engine chiller to limit the peak electric demand of a 1.2 million sq ft office building.
Original language | English (US) |
---|---|
Pages (from-to) | 51-59 |
Number of pages | 9 |
Journal | HPAC Heating, Piping, Air Conditioning |
Volume | 70 |
Issue number | 9 |
State | Published - Sep 1998 |
All Science Journal Classification (ASJC) codes
- Fluid Flow and Transfer Processes