Production monitoring scheme for continuous mining sections

J. L. Kohler, D. B. Gentzler

Research output: Contribution to specialist publicationArticle

Abstract

A method of monitoring production information (raw tonnage and machine state) from each working section has been developed. The method is based on the sensing of electrical parameters in each section load center, and the reporting of this information through the existing mine-wide monitoring system. A decision-theoretic type of pattern classification technique has been used to define the machine states. The basis of the method is presented along with a proposed hardware and software implementation scheme. Information issues central to the development and use of the proposed production monitoring system are also discussed.

Original languageEnglish (US)
Pages175-179
Number of pages5
Volume41
No3
Specialist publicationMining Engineering
StatePublished - Mar 1989

All Science Journal Classification (ASJC) codes

  • Geotechnical Engineering and Engineering Geology

Fingerprint

Dive into the research topics of 'Production monitoring scheme for continuous mining sections'. Together they form a unique fingerprint.

Cite this