TY - JOUR
T1 - Risk assessment for loader- and dozer-related fatal incidents in U.S. mining
AU - Md-Nor, Zainalabidin
AU - Kecojevic, Vladislav
AU - Komljenovic, Dragan
AU - Groves, William
N1 - Funding Information:
The research work in this paper is financially supported by Western US Mining Safety and Health Training and Translation Center. Their contribution is gratefully acknowledged.
Publisher Copyright:
© 2008, Copyright Taylor & Francis Group, LLC.
PY - 2008
Y1 - 2008
N2 - The paper presents the results of research aimed at developing a risk assessment process that can be used to more thoroughly characterise risks associated with loader- and dozer-related fatal incidents in US mining. The assessment is based on historical data obtained from the US Mine Safety and Health Administration investigation reports, which includes 77 fatal incidents that occurred from 1995 to 2006. The Preliminary Hazard Assessment method is used in identifying and quantifying risks. Risk levels are then developed using a pre-established risk matrix that ranks them according to probability and severity. The resulting assigned risk value can then be used to prioritise risk control strategies. A total of 10 hazards were identified for loaders. The hazards ‘failure to follow adequate maintenance procedure’ and ‘failure of mechanical/electrical/hydraulic components’ were the most severe and frequent hazards and they fell into the category of ‘high’ risk. The same number of hazards was identified for dozers. The hazard ‘failure to identify adverse site/geological conditions’ was the most severe and frequent hazard and it fell into the category of ‘high’ risk.
AB - The paper presents the results of research aimed at developing a risk assessment process that can be used to more thoroughly characterise risks associated with loader- and dozer-related fatal incidents in US mining. The assessment is based on historical data obtained from the US Mine Safety and Health Administration investigation reports, which includes 77 fatal incidents that occurred from 1995 to 2006. The Preliminary Hazard Assessment method is used in identifying and quantifying risks. Risk levels are then developed using a pre-established risk matrix that ranks them according to probability and severity. The resulting assigned risk value can then be used to prioritise risk control strategies. A total of 10 hazards were identified for loaders. The hazards ‘failure to follow adequate maintenance procedure’ and ‘failure of mechanical/electrical/hydraulic components’ were the most severe and frequent hazards and they fell into the category of ‘high’ risk. The same number of hazards was identified for dozers. The hazard ‘failure to identify adverse site/geological conditions’ was the most severe and frequent hazard and it fell into the category of ‘high’ risk.
UR - http://www.scopus.com/inward/record.url?scp=54049125314&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=54049125314&partnerID=8YFLogxK
U2 - 10.1080/17457300801977261
DO - 10.1080/17457300801977261
M3 - Article
C2 - 18642163
AN - SCOPUS:54049125314
SN - 1745-7300
VL - 15
SP - 65
EP - 75
JO - International journal of injury control and safety promotion
JF - International journal of injury control and safety promotion
IS - 2
ER -