Abstract
This paper describes a study conducted for a manufacturer of specialty steel products including steel coil. The purpose of the work was to improve the performance of the company's hot strip rolling mill, which was a production bottleneck. Two opportunities for improvement were identified: capital expenditures to upgrade the mill and better scheduling of products through the mill. This paper describes an interactive computer aided procedure which can generate schedules satisfying several objectives.
Original language | English (US) |
---|---|
Pages | 401-404 |
Number of pages | 4 |
State | Published - 1986 |