Abstract
Scheduling is an important aspect in the overall control of a flexible manufacturing system. The research presented focuses on production scheduling of jobs within a flexible manufacturing cell (FMC)-one type of flexible manufacturing system. Due to the complexity of the FMC scheduling problem, a 0-1 mixed-integer linear programming (MILP) model is formulated for M machines and N jobs with alternative routings. Although small instances of the problem can be solved optimally with MILP models, a two-stage Tabu Search (TS2) algorithm that minimises the manufacturing makespan (MS) is proposed to solve medium-to-large-scale problems more efficiently. During Stage I (construction phase), two heuristics are utilised to generate an initial feasible sequence and an initial MS solution. In Stage II (improvement phase), the acquired initial solutions from Stage I are combined with a Tabu Search meta-heuristic procedure that provides improved MS solutions. The TS2 algorithm provides tremendous savings in computational time for medium/large-sized multi-machine FMC problems.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 6907-6928 |
| Number of pages | 22 |
| Journal | International Journal of Production Research |
| Volume | 47 |
| Issue number | 24 |
| DOIs | |
| State | Published - Feb 2009 |
All Science Journal Classification (ASJC) codes
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Scheduling flexible manufacturing cells using Tabu Search'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver