Abstract
Scheduling in a remanufacturing environment is more complex and the scheduler must deal with more uncertainty than in a traditional manufacturing environment. In order to properly schedule in a remanufacturing environment the schedule must be able to cope with several complicating factors which increase variability. The schedule must be able to cope with conditional routeings, a routeing that may or may not be taken due to the condition of the unit. The schedule must also be able to cope with dependent events, e.g. operation B cannot begin until operation A is completed. Drum-buffer-rope (DBR.) offers an extremely robust method of scheduling. A schedule built using DBR can take both conditional routeings and dependent events into account. A realistic example from a military depot is discussed in detail and each step required to build a schedule using DBR is explained fully. This paper also shows the results from a simulation model of DBR at a repair/rework depot which are benchmarked against the present production planning and control system.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 1081-1091 |
| Number of pages | 11 |
| Journal | International Journal of Production Research |
| Volume | 34 |
| Issue number | 4 |
| DOIs | |
| State | Published - Apr 1996 |
All Science Journal Classification (ASJC) codes
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering