Abstract
This paper deals with the single machine earliness and tardiness scheduling problem with a common due date and resource-dependent release dates. It is assumed that the cost of resource consumption of a job is a non-increasing linear function of the job release date, and this function is common for all jobs. The objective is to find a schedule and job release dates that minimize the total resource consumption, and earliness and tardiness penalties. It is shown that the problem is NP-hard in the ordinary sense even if the due date is unrestricted (the number of jobs that can be scheduled before the due date is unrestricted). An exact dynamic programming (DP) algorithm for small and medium size problems is developed. A heuristic algorithm for large-scale problems is also proposed and the results of a computational comparison between heuristic and optimal solutions are discussed.
Original language | English (US) |
---|---|
Pages (from-to) | 52-69 |
Number of pages | 18 |
Journal | European Journal of Operational Research |
Volume | 142 |
Issue number | 1 |
DOIs | |
State | Published - Oct 1 2002 |
All Science Journal Classification (ASJC) codes
- General Computer Science
- Modeling and Simulation
- Management Science and Operations Research
- Information Systems and Management