Time-slotting based upon an assumed log-normal distribution of sample work task times

Kenneth Knott, Jeya Chandra, E. Emory Enscore

Research output: Contribution to journalArticlepeer-review

Abstract

The design and examination of time-slots using a concept originally proposed by Knott (1984) is considered with respect to work-task times having a log-normal distribution. Specific equations for this distribution are developed and a computer program to simplify calculations presented. The advantage of reducing the truncation levels so far as improving the precision and reducing the number of time-slots is demonstrated. In addition to this, the weakness of a previous, widely used, design algorithm is shown. The use of analytic and simulation approaches in evaluating time-slotting scales is explored.

Original languageEnglish (US)
Pages (from-to)487-512
Number of pages26
JournalInternational Journal of Production Research
Volume25
Issue number4
DOIs
StatePublished - Apr 1987

All Science Journal Classification (ASJC) codes

  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Time-slotting based upon an assumed log-normal distribution of sample work task times'. Together they form a unique fingerprint.

Cite this