Abstract
Scheduling of resources and tasks has been, a key focus of manufacturing-related problems for many years. The research presented here focuses on production routing and scheduling of jobs within a flexible manufacturing cell. The major objective is to develop a two-stage heuristic methodology that minimizes the manufacturing makespan. For the routing phase (Stage I), a modified earliest completion time heuristic is utilized to construct initial feasible sequences. Then, during the sequencing phase (Stage II), a common heuristic is used to determine the makespan value. An illustrative example is given to show that the proposed heuristic methodology is effective in acquiring good solutions for small-to-medium size multi-machine FMC problems.
| Original language | English (US) |
|---|---|
| State | Published - 2006 |
| Event | 2006 IIE Annual Conference and Exposition - Orlando, FL, United States Duration: May 20 2006 → May 24 2006 |
Other
| Other | 2006 IIE Annual Conference and Exposition |
|---|---|
| Country/Territory | United States |
| City | Orlando, FL |
| Period | 5/20/06 → 5/24/06 |
All Science Journal Classification (ASJC) codes
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Two-stage algorithm for routing and scheduling flexible manufacturing cells'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver