TY - GEN
T1 - Uuncertainty-based scheduling of multi-chiller system with thermal energy storage under real-time prices
AU - Sadat-Mohammadi, Milad
AU - Khazaei, Javad
AU - Asadi, Somayeh
N1 - Publisher Copyright:
© 2021 IEEE.
PY - 2021
Y1 - 2021
N2 - Real-time electricity prices are announced by utility companies as a part of demand response programs to ensure the lowest total cost of service for the customers. Under the real-time pricing strategy, the risk of price variation is shared between the customer and the service provider; therefore, residential customers can reduce their electricity payment through proper scheduling of the major energy consumption equipment. In residential complexes, chiller units are one of the major contributors to the buildings' overall energy consumption; consequently, optimal scheduling of their operation can be a promising step toward reducing the operational cost. In this study, a robust optimization method is developed for optimal operation of the multi-chiller system with chilled-water storage unit considering the uncertainty associated with the predicted real-time prices. The proposed method is evaluated on a case study consisting of four multi-chiller unit and one chilled-water storage unit to investigate the operational cost variation. Simulations are conducted in GAMS software, where the results showed that the proposed method can reduce the operational cost deviation resulted by uncertainty in electricity rates.
AB - Real-time electricity prices are announced by utility companies as a part of demand response programs to ensure the lowest total cost of service for the customers. Under the real-time pricing strategy, the risk of price variation is shared between the customer and the service provider; therefore, residential customers can reduce their electricity payment through proper scheduling of the major energy consumption equipment. In residential complexes, chiller units are one of the major contributors to the buildings' overall energy consumption; consequently, optimal scheduling of their operation can be a promising step toward reducing the operational cost. In this study, a robust optimization method is developed for optimal operation of the multi-chiller system with chilled-water storage unit considering the uncertainty associated with the predicted real-time prices. The proposed method is evaluated on a case study consisting of four multi-chiller unit and one chilled-water storage unit to investigate the operational cost variation. Simulations are conducted in GAMS software, where the results showed that the proposed method can reduce the operational cost deviation resulted by uncertainty in electricity rates.
UR - http://www.scopus.com/inward/record.url?scp=85123379857&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85123379857&partnerID=8YFLogxK
U2 - 10.1109/IGESSC53124.2021.9618699
DO - 10.1109/IGESSC53124.2021.9618699
M3 - Conference contribution
AN - SCOPUS:85123379857
T3 - 2021 IEEE Green Energy and Smart Systems Conference, IGESSC 2021
BT - 2021 IEEE Green Energy and Smart Systems Conference, IGESSC 2021
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2021 IEEE Green Energy and Smart Systems Conference, IGESSC 2021
Y2 - 1 November 2021 through 2 November 2021
ER -